How Do CNC Precision Machining Manufacturers Quote? How To Calculate Costs?

2021-08-17 10:51:41
Times

The Material Cost Is Certain, The Main Difference Lies In The Different Labor Costs, Transportation Costs, Consumption Costs Taxes Of Each Company. So How Do Most Machining Factories Calculate These Costs?


The Following Is Some Information Compiled By Huiwen Zhizao Editor For Reference (Because The Calculation Method Varies Due To Local Prices)


Detailed Calculation Method For Precision Machining Manufacturers

1) First, You Can Ask The Other Party To Provide Preliminary Process Arrangements For Key Complex Parts, Including Details Of Each Process The Time Required For Each Process.

2) The Processing Cost Can Be Calculated Based On The Hourly Cost Of The Equipment Required For Each Process. You Can Also Ask The Supplier For The Specific Equipment Cost, For Example: Ordinary Vertical Milling Machine Is Between ¥60~80 Per Hour (Tax Included); Ordinary Equipment Such As Milling Machines General Lathes Are Generally ¥30.

3) Add Packaging Transportation, Management Costs, Tooling Profit In Proportion To Get The Price. Of Course, The Price Will Be Closely Related To The Annual Purchase Volume Difficulty Of The Part. It Is Easy To Understand That There Will Be A Big Difference In Price Between Single Piece Batch. Huiwen Zhizao Is A Machining Factory With More Than Ten Years Of CNC Machining Experience . It Has Complete Equipment, CNC Lathe/Milling/Grinding/Drilling/Machining. Welcome Partners With Parts Processing Needs To Call Us For Quotation.


Rough Estimation Method For Machining :

1) For Large Items, The Volume Is Larger The Weight Is Heavier.

Moderate Difficulty: The Ratio Of Processing Cost To The Raw Material Cost Of The Entire Part Is About 1:1, This Ratio Is Inversely Proportional To The Purchase Volume;

More Difficult: The Ratio Of Processing Cost To The Raw Material Cost Of The Entire Part Is About 1.2~1.5:1, This Ratio Is Inversely Proportional To The Purchase Volume;


Huiwen Workshop


2) For Small Medium-Sized Items

Moderate Difficulty: The Ratio Of Processing Cost To The Raw Material Cost Of The Entire Part Is About 2~3:1, This Ratio Is Inversely Proportional To The Purchase Volume;

More Difficult: The Ratio Of Processing Cost To The Raw Material Cost Of The Entire Part Is About 5~10:1, This Ratio Is Inversely Proportional To The Purchase Volume;


Since Machining Has Great Process Flexibility, That Is, A Part Can Have Many Process Arrangements, The Costs Are Of Course Different. However, Suppliers Sometimes Give You A Complex Process To Increase The Price When Quoting You, While Other Simpler Processes Are Used In Actual Production. Therefore, The Buyer's Own Reading Of The Drawings Knowledge Of Parts Processing Determine Your Grasp Of Costs. Therefore, The Purchase Of Mechanical Parts Requires Relatively Comprehensive Knowledge Of Machining.


The Composition Of Machining Costs Is Generally Based On Working Hours!


If You Want To Process A Workpiece, The First Thing You Have To Pay Is The Material Cost Of The Other Party; Then There Is Some Travel Expenses For Purchasing The Workpiece (Usually There Is None);


The Most Important Thing Is The Processing Time Required For The Workpiece You Want To Process. Generally, Lathe Workers Pay 10-20 Yuan Per Hour, Fitters Pay Less, About 10-15 Yuan Per Hour. The Rest Are Listed Here.


If There Are No Ready-Made Tools (Such As Knives, Molds), You Will Need To Bear Part All Of The Purchase Cost; The Final Total Is The Processing Fee You Have To Pay!


The Basics Include Material Costs, Machine Depreciation, Labor Costs, Management Fees, Taxes, Etc. Material Costs, Processing Fees Taxes, As Well As Business Expenses Transportation Costs. To Make A Budget, You Need To Have A Thorough Understanding Of The Market. If You Don't Work In It For A Few Years, You Will Have No Idea At All. Even My Teacher Often Sighs! You Can't Be Careless At All! Huiwen Zhizao Is A Machining Factory With More Than Ten Years Of CNC Processing Experience. It Has A Full Range Of Equipment, CNC Lathe/Milling/Grinding/Drilling/Processing. Welcome Partners With Parts Processing Needs To Call Us For Quotation.


The Process Should Include Material Costs, Processing Costs (The Price Will Be Different Depending On The Type Of Processing), Equipment Depreciation, Worker Wages, Management Fees, Taxes, Etc. The Main Thing Is To First Determine The Process, That Is, The Processing Method, Then Calculate The Working Hours Based On The Process. The Basic Processing Cost Of A Single Part Is Determined By The Working Hours, Then Other Costs Are Added. The Process Is A Very Complicated Subject. A Part Uses Different Processes The Price Is Different.


Machine shop


In Fact, There Is No Fixed Price For Each Type Of Work. It Will Vary According To The Difficulty Of The Workpiece, The Size Of The Equipment, The Performance. Of Course, The Key Is To See How Much You Do. But Generally Speaking, There Is A Basic Price, Which Fluctuates Between The Basic Prices:


1. Basic Price Of The Car: 20-40


The Specific Amount Depends On The Actual Situation. For Small Items, Simple Labor Hours May Be Less Than 20 Yuan; Sometimes Even Only 10 Yuan.


For Example, Some Large Pulleys Have Large Machining Allowances, So The Boss Only Needs To Make Money Cast Iron Powder;


Sometimes If The Workpiece Is Large Cannot Be Processed On The Market, The Size Can Be Higher, Two Three Times, Others Can’t Do Anything About It.


2. Grinding Basic Price: 25-45

3. Basic Price Of Milling: 25-45


4. Diamond Basic Price: 15-35

5. Basic Price: 15-35

6. Basic Price Of Wire Cutting: 3-4/900 Square Millimeters


7. Basic Price Of EDM: 10-40, Single Piece Is Generally 50/Piece (Less Than 1 Hour)

8. NC Basic Price: 2-4 Times More Expensive Than Ordinary Ones


9. Carving: Generally It Is Single Piece, 50-500/Piece. Of Course, The Price Depends On The Specific Product.


The Above Prices Are For Reference Only. If You Have Any Experience, I Hope You Can Share It We Can Communicate Together.   


Attached Is The Basic Price Of Processing Hours For Each Type Of Work


No. Equipment Name Model Processing Range Processing Fee (Yuan/Hour)

1. Lathe C616 Φ320×750~1000 11

2. Lathe C6140 Φ400×1000~2000 13

3. Lathe J1-MAZAK Φ460×1000~2000 15

4. Lathe C6150 Φ460×1000~2000 15

5. Lathe C630 Φ630×1000~2000 21

6. Lathe C650 Φ800×1500~5000 30

7. Vertical Lathe C5116A Φ1600 28

8. Radial Drilling Machine Z3050 Φ50~Φ63 16


9. Radial Drilling Machine Z3080 Φ80 20

10. Vertical Drilling Machine Z5140A Φ32~Φ40 12

11. Horizontal Boring Machine T68 1000×1000 26

12. Horizontal Boring Machine T611 1000×1000 30

13. Vertical Boring Machine T4163 630×110056

14. Horizontal Boring Machine T6111A 1200×1200 36

15. Universal External Grinding Machine M1420 Φ125~220×350~1000 15

16. Universal External Grinding Machine M1432A M9025×500~1000 19

17. Universal External Grinding Machine M1432B Φ315~320×1500~3000 26

18. Universal External Grinding Machine M1331A Φ315~320×1500~3000 26

19. Universal External Grinding Machine M1450 Φ500×1500~2000 28

20. Precision Universal External Grinding Machine MG1432 Φ320×1000~2000 32


21. Internal Grinding Machine MG1432 Φ12~Φ100×130 13

22. Surface Grinder M7120 200×630~650 16


23. Surface Grinder M7130 300×1000 21

24. Surface Grinder M7150 500×2000 40

25. Guide Rail Grinder M50100 1000×6000 28

26. Spline Grinder M8612A Φ120×1800 28

27. Thread Grinder Y7520W Φ200×500 20

28. Gear Grinder Y4632A Φ320×6M 30

29. Universal Tool Grinder M5MCΦ200×500 13

30. Universal Tool Grinder MW6020 Φ200×500 13

31. Universal Tool Grinder M9025Φ200×650 16

32. Universal Tool Grinder M6025H Φ250×650 16

33. Universal Tool Grinder M6425Φ250×650 16

34. Broach Grinder M6110D Φ100×1500~1700 16

35. Gear Hobbing Machine YM3150E Φ500×8M 22

36. Rod Rack YM5150B Φ500×8M 18

37. Vertical Milling Machine X5030A Φ300×1120 16


38. Vertical Milling Machine X52K Φ320×1250 18

39. Vertical Milling Machine XA5032 Φ320×1250 18

40. Horizontal Milling Machine X63W Φ400×1600 24

41. Ram Milling Machine XS5646/1 Φ425×2000 28

42. Shaper B665 650×800 14

43. Shaper B650 650×800 11

44. Hydraulic Shaper BY60100900~1000 16

45. Hydraulic Shaper B690 900~1000 16

46. Planer B2016A 900~100028

47. Planer B2020A 2000~6000 50

48. Pole Bed B5032 200~320 12

49. Broaching Machine L6140 40T 15

50. Marking Fitter Φ200×650 15

51. Assembly Fitter Φ200×650 30


52. Mould Fitter Φ200×650 30

53. Machining Center Φ200×650 80

54. Wire Cutting Φ200×6509 55

55. Welding Knife Φ200×650 7



Due To Different Regions, Different Times, Different Machining Manufacturers , Different Demanders, Different Suppliers, Different Quantities, There Are Many Differences, The Prices Vary Greatly. However, They Are Generally Charged According To The Processing Hours. Here Is A Reference (The Numbers Are Only For Reference, The Differences In Regions Time Are Really Large): Huiwen Zhizao Is A Machining Factory With More Than Ten Years Of CNC Processing Experience, With Complete Equipment, CNC Lathe/Milling/Grinding/Drilling/Processing. Partners With Parts Processing Needs Are Welcome To Call Us For Quotation.


This Data Does Include Electrical Machining, Such As Wire Cutting, Which Is Generally Charged Based On The Processed Area.



1. Pricing By Working Hours: Z25 Drilling Machine, CA6140 Lathe, Planer, Slotting Machine Sawing Machine Are Charged At 15 Yuan Per Hour. Vertical Horizontal Milling Machines, Wire Cutting, Large Lathes Gantry Milling Machines Are Charged At 20 Yuan Per Hour. Benchwork General Maintenance Are Charged At 15 Yuan Per Hour. The Time Unit Starts The Start Of Processing Until The Processing Is Completed Accepted.


2. Charging Method Based On Parts, Quantity Precision Requirements:


1. Drilling General Materials

For Diameters Below 25mm, The Drill Diameter Is Calculated As 0.05. For Diameters Between 25-60mm, The Drill Diameter Is Calculated As 0.12 (The Minimum Hole Size Is Less Than 0.5 Yuan).


For General Materials With Depth-To-Diameter Ratio Greater Than 2.5, The Base Price*Depth-To-Diameter Ratio*0.4 Is Charged. For Materials With Aperture Accuracy Less Than 0.1MM Center Distance Less Than 0.1MM, The Base Price*5 Is Charged.


The Tapping Fee Is Charged At The Tap Diameter * 0.2 (Based On Cast Iron, Steel Parts * 1.2). For Batch Processing , The Standard Base Price * 0.2-0.8 Is Charged (Depending On The Batch Size The Difficulty Of Processing).



2. General Precision Optical Axis Processing For Lathe Processing

For Those With Aspect Ratio Less Than 10, The Fee Is Calculated Based On The Blank Size*0.2 (Minimum 5 Yuan)


For The Aspect Ratio Greater Than 10, The Price Is Charged As The General Optical Axis Base Price * Aspect Ratio * 0.15. For The Accuracy Requirement Within 0.05MM The Requirement Of Taper, The Price Is Charged As The General Optical Axis Base Price * 2


General Stepped Shafts (Fan Shafts, Pump Shafts, Reducer Shafts, Grinding Wheel Shafts, Motor Shafts, Spindles, Etc.) Are Charged At The General Precision Optical Shaft Processing Base Price * 2. If The Stepped Shaft Has Taper, Internal External Threads, It Is Charged At The General Precision Optical Shaft Processing Base Price * 3


General Purpose Lead Screws Are Charged At The Base Price Of General Precision Optical Axis Processing*4


Generally, Flange Parts Are Charged At Material Diameter*0.07, Parts With A Diameter Greater Than 430MM Are Charged At Material Diameter*0.12.


General Round Nut Parts Are Charged According To Diameter*0.25 (Including Materials)


Generally, The Trapezoidal Triangular Nut Parts Are Diameter*0.3 (Without Materials)


For General Shaft Sleeve Parts (Diameter Less Than 100 Diameter-To-Length Ratio Less Than 2), The Price Is Charged At Material Outer Diameter*0.2. For Diameter-To-Length Ratio Exceeding 2, The Price Is Charged At Diameter-To-Length Ratio*Base Price*0.6


Generally, The Repair Price For Bearing Parts With Less Than 2mm Wear, Diameter Less Than 40mm Width Less Than 25mm Is 5 Yuan Each. If A Center Frame Is Required, The Length Is Greater Than 1.7 Meters, The Base Price * 2 Will Be Charged. If The Diameter Is Greater Than 40mm, The Charge Is Diameter * 0.2.



3. General Keyway Processing On Milling Machines


(For Aspect Ratio Less Than 10), The Button Slot Width * 0.5 Is Charged (Minimum 5 Yuan). For Aspect Ratio Exceeding 10, The Aspect Ratio * Base Price * 0.1 Is Charged.


If There Are Strict Location Requirements, The Base Price*2 Will Be Charged.


The Processing Of Materials With Hardness Greater Than HRC40 Is Charged At Base Price*2.


For General Spline Processing (Length-To-Diameter Ratio Less Than 5), The Charge Is Based On The Outer Diameter Of The Spline Shaft * 0.8 (Minimum 15 Yuan)


The General Gear Processing Is Charged At Module * Number Of Teeth * 0.5 Yuan. Worm Gears Are Charged At Base Number * 1.2. Helical Gears, Bevel Gears, Displacement Gears Are Charged At Base Price * 2.


General Surface Processing Is Charged At 1.5 Yuan Per Square Decimeter (Minimum 5 Yuan)


Generally, Boring Processing Is Charged Based On Hole Diameter*0.25.


4. For Band Saw Processing Of General Round Steel, Thick-Walled Tube, Square Steel, The Price Is 5 Yuan Per Square Decimeter (Minimum 5 Yuan). For General Steel Plate Cutting, Striping, Angle Opening, The Price Is 10 Yuan Per Square Decimeter (Minimum 10 Yuan).



5. For General Parts Processed By Wire Cutting, The Charge Is Based On The Cutting Area (Square Millimeter)*0.008 Yuan. For Parts That Need To Be Threaded, An Additional Charge Of 5 Yuan Will Be Added For Each Threading Hole.


6. Electric Welding, Gas Cutting Plasma Cutting: 1 Yuan For Each Common Electrode With A Diameter Of 3.2, 3 Yuan For Each TH506 Welding Casting. Gas Cutting Is Calculated Based On The Thickness Of The Iron Plate MM*Cutting Length M. Plasma Cutting Of Stainless Steel Is Charged At The Gas Cutting Base Price*3, Cutting Of Carbon Steel Is Charged At The Gas Cutting Base Price*2.



7. Regarding Special Urgent Parts Overtime Parts, The Standard Base Price*2 Is Charged. Special Urgent Parts Are Defined As: Arranging For The Repair Manufacture Of Urgent Parts For A Specific Customer As Soon As Possible. Overtime Parts Refer To Parts That Must Be Manufactured Continuously Beyond Normal Working Hours. The Team Of Shenzhen Huiwen Intelligent Manufacturing Technology Co., Ltd. Was Established In 2010 Is Located On The 1st Floor Of Building F3, Tianyou Maker Industrial Park, Lixinhu, Fuyong, Bao'an District, Shenzhen. It Has Long Been Committed To The Processing Of High-Precision, High-Difficulty, Easy-To-Deform Metal Plastic Parts , Small Medium-Volume Production Manufacturing Of Light Alloy Composite Materials (Such As Aluminum Alloy, Carbon Fiber, Etc.),  Robot Parts Procurement Customization Services.


Optical Tool Curve Grinding Processing Fee Is 60 Yuan/Hour,


200 Lathes, 20 Yuan/Hour,


300 Lathes Above 300 Yuan/Hour,


Milling Machine 20 Yuan/Hour, Drilling 15 Yuan/Hour,


Boring Machine 35 Yuan/Hour,


Grinding Machine 30 Yuan/Hour,


Insertion Bed 15 Yuan/Hour,


Shaper 20~25 Yuan/Hour,


Gantry Planer Milling Machine 30 Yuan/Hour,


Rolling Machine (Rolling Steel Plate Thickness Below 20) 60 Yuan/Hour,


C620.C6140 Is Basically 20 Yuan Per Hour.


30 Lathes Cost 30 Yuan Per Hour,


Vertical Lathe 50 Lathe One Hour 60 Yuan,


Radial Drill Costs 20 Yuan Per Hour.


T68 Boring Machine Costs 30 Yuan Per Hour.


Small Vertical Milling Horizontal Milling For Planing Are 20 Yuan Per Hour.


Gantry Milling Planing 60 Yuan Per Hour,


400 Square Meters A Bed With A Diameter Of Less Than One Meter Is 20 Yuan Per Hour.


Three Meters Away, 60 Yuan Per Hour.


The Machining Center Is 80 Yuan Per Hour (The Same Calculation Is Used For Milling Turning).


Electric Welding Gas Cutting Are Basically Calculated By Piece. If It Is Convenient To Calculate, It Is Calculated As 30 Yuan Per Hour.


The Fee For Fitter Assembly Is 20 Yuan Per Hour.



In Addition, The Labor Payment Is Also Related To The Amount Of Outsourced Processing. The Market Price Of Finishing Labor Hours Is:


Fine Grinding Tolerance 0.005 40 Yuan/Hour,


Spark Tolerance 0.01 80 Yuan/Hour,


Slow Wire Tolerance 0.005 100 Yuan/Hour,


Smooth Grinding Tolerance 0.003 180 Yuan/Hour.



1. Annual Output (Determines Investment Scale)

2. Allocation Of Plant Land Investment 3. Number Of Welding Stations Assembly Line Depreciation Rate (Assembly Line Allocation)

4. Number Of Welding Equipment Depreciation Rate (Equipment Investment Allocation)

5. Cost Of Welding Consumables


6. Welding Fixtures Depreciation Rate (Tool Investment Allocation)


7. Wages (Including Wages, Bonuses, Work Meal Expenses, Transportation Expenses, Medical Funds, Unemployment Funds, Pension Funds, Housing Provident Funds Personal Adjustment Taxes Of Production Workers, Technicians Managers, Etc.) Working Hours Utilization Rate


8. Energy Consumption Environmental Protection Cost Investment Allocation

9. Daily Maintenance Costs Of Welding Equipment, Fixtures Assembly Lines


10. Sharing Of Costs Incurred In Scrapping Rework


11. Product Development Cost Sharing


12. Sharing Of Social Expenses


13. Profitability


14. Various Tax Rates


Generally Including The Above Aspects, There May Be A Lot Of Omissions! Shenzhen Huiwen Intelligent Manufacturing Technology Co., Ltd. Team Was Established In 2010, Located In The 1st Floor Of F3 Building, Tianyou Maker Industrial Park, Lixinhu, Fuyong, Bao'an District, Shenzhen. It Has Long Been Committed To The Processing Of High-Precision, High-Difficulty, Easy-To-Deform Metal Plastic Parts, Small Medium-Volume Production Manufacturing Of Light Alloy Composite Materials (Such As Aluminum Alloy, Carbon Fiber, Etc.), Robot Parts Procurement Customization Services.